Installation and start-up
The batteries are installed only by qualified service technicians. Installation time is dependent on the system design and size of the installation.
The typical schedule of events:
- Unloading, erection, levelling
- Filling tanks with electrolyte and first charge
- Test of the hydraulic and electrical systems
- Test of the remote communications
- Electrical connection to the energy sources and loads
- Test of the whole system and transfer to the customer